Project Description
- Project name: Masterplan and management of container jetty
- Project location: Port of Coronel, Chile
- Name of client: RMG
- Period: Jan 2008 – Dec 2009
Description of the project
In view of the changing market conditions in the maritime sector in Chile, the Port of Coronel intended to develop container facilities.
A development plan has been drawn up. The organization of the Port of Coronel and the existing plans had to be reviewed, inclusive equipment. A masterplan for the container developments up to 2020 had to be made and operational assistance was needed.
Services provided by Port Consultants Rotterdam
- Description of process flows.
- Selection of port equipment.
- Description of the lay-out of the port, the jetty and the Manco area.
- Operational aspects and the determination of required equipment and the equipment cost.
- Definition of IT requirements.
- Interim operational management.